Incident Eurocopter AS 350B3 Ecureuil HB-XQJ,
ASN logo
ASN Wikibase Occurrence # 83544
 
This information is added by users of ASN. Neither ASN nor the Flight Safety Foundation are responsible for the completeness or correctness of this information. If you feel this information is incomplete or incorrect, you can submit corrected information.

Date:Wednesday 2 September 2009
Time:11:30 LT
Type:Silhouette image of generic AS50 model; specific model in this crash may look slightly different    
Eurocopter AS 350B3 Ecureuil
Owner/operator:Air Glaciers SA
Registration: HB-XQJ
MSN: 3093
Year of manufacture:1998
Fatalities:Fatalities: 0 / Occupants: 1
Other fatalities:1
Aircraft damage: None
Location:Fully, VS -   Switzerland
Phase: Manoeuvring (airshow, firefighting, ag.ops.)
Nature:Cargo
Departure airport:Euloz - offshore
Destination airport:Euloz - offshore
Investigating agency: BFU Switz.
Confidence Rating: Information verified through data from accident investigation authorities
Narrative:
The helicopter lifts the south facade element weighing approximately 400 kg and makes the trip to the construction site. The pilot works by means of the so-called “vertical reference” technique, i.e. in direct visual contact with the load.

The façade element is placed in its location and held in place by ground personnel. After a few adjustments, the site manager judges that the wall is in place and signals to the chief assistants that the helicopter can lighten the load in order to allow the release of the two securing straps. The wall is then held in a vertical position by five people.

The site manager gives the order to his worker located inside the building on the west side to unhook the first strap. A V-shaped stepladder is used for this purpose and does not lean against the wall.

The worker announces aloud that the first strap is unhooked. The worker descends from his stepladder, moves towards the east, installs the stepladder which allows him to unhook the second strap.

When the second strap is unhooked, the site manager sees the assistant manager moving on the downstream side of the wall from the west corner in an easterly direction. The site manager hears the assistant manager talking about his surprise on the radio when the transport equipment is taken back. At this time, only three people hold the wall in a vertical position.

Several steel strops as well as some previously used guide ropes are stored in the center of the site. The chief assistant guides the pilot by radio, the helicopter is positioned directly above this equipment and a flight assistant secures it to the hook of a transport strap. The helicopter moves away from the construction site in a southerly direction towards the starting place to perform a new rotation. At this moment, all the personnel of the construction company felt the blast produced by the helicopter. The southern facade element tilts towards the downstream of the site. The people who maintain it try in vain to hold it back.

One of the bosses of the construction company, then located outside the site, seeing the wall fall, took refuge to the west of the site. The head assistant located at this precise moment downstream of the wall tries to take shelter but cannot escape in time. He was fatally injured by the tilting of the facade element.

Accident investigation:
cover
  
Investigating agency: BFU Switz.
Report number: 
Status: Investigation completed
Duration:
Download report: Final report

Sources:

http://www.bfu.admin.ch/common/pdf/HB-XQJ.pdf

Revision history:

Date/timeContributorUpdates
20-Dec-2010 12:00 Alpine Flight Added
09-Nov-2022 07:22 Anon. Updated [Narrative]

Corrections or additions? ... Edit this accident description

The Aviation Safety Network is an exclusive service provided by:
Quick Links:

CONNECT WITH US: FSF on social media FSF Facebook FSF Twitter FSF Youtube FSF LinkedIn FSF Instagram

©2024 Flight Safety Foundation

1920 Ballenger Av, 4th Fl.
Alexandria, Virginia 22314
www.FlightSafety.org