Runway excursion Accident Boeing 747-212B (SF) N808MC,
ASN logo
ASN Wikibase Occurrence # 322469
 
This accident is missing citations or reference sources. Please help add citations to guard against copyright violations and factual inaccuracies.

Date:Monday 24 January 2005
Time:06:01
Type:Silhouette image of generic B742 model; specific model in this crash may look slightly different    
Boeing 747-212B (SF)
Owner/operator:Atlas Air
Registration: N808MC
MSN: 21048/253
Year of manufacture:1975
Total airframe hrs:92024 hours
Cycles:22782 flights
Engine model:General Electric CF6-50E2
Fatalities:Fatalities: 0 / Occupants: 3
Aircraft damage: Substantial, written off
Category:Accident
Location:Düsseldorf Airport (DUS) -   Germany
Phase: Landing
Nature:Cargo
Departure airport:Dubai Airport (DXB/OMDB)
Destination airport:Düsseldorf Airport (DUS/EDDL)
Investigating agency: BFU
Confidence Rating: Accident investigation report completed and information captured
Narrative:
The Boeing 747 operated on a cargo flight from Dubai to Düsseldorf on behalf of Emirates. The en route part of the flight was uneventful.
The flight crew established radio contact with Düsseldorf Radar at 05:43. The crew were told that runway 23L was in use.
Two minutes later the radar controller contacted flight 8995: "I just talked to the tower and ah for the time being braking action on all parts of the runway is supposed to be good. They are measuring again right now because it started to snow again and I'll keep you advised." The flight was then cleared to descend to FL80. The flight crew decided to set the autobrakes for landing on Medium, to account for the snow.
At 05:50 the radar controller again contacted the flight about the current weather circumstances: "...latest update on the weather situation ahm the friction tester has reported braking action to be good for the moment however as its continuing to snow they are ah afraid that it might worsen, so they are going to do another friction test right before you land."
In the following minutes the flight was given descent instructions and vectors for an approach to runway 23L.
At 05:54 the controller radioed: "weather update we now have a surface wind of three four zero degrees eleven knots, that's slight tail wind component by two knots. Visibility is down to one thousand five hundred meters, still in snow showers and ah cloud base is now five hundred feet only."
The flight was subsequently cleared for the approach.
At 05:57 the radar controller instructed the crew to contact Düsseldorf Tower. The Tower controller stated: "Good morning,... we are just waiting for the braking action values from the friction tester stand by a second. The surface wind is actually three three zero degrees one two knots."
Two minutes later the controller radioed: "... the braking action was measured to be medium at all parts. And ah the visibility dropped right now due to the heavy snow showers at the field ah. The RVR value at the touch down zone is presently nine hundred meters, at the mid-point one thousand one hundred meters and ah stop end one thousand one hundred meters." At that moment the flight was 3,5 nautical miles out. The flight was subsequently cleared to land.
The airplane touched down about 1700 ft (518 m) past the runway threshold. Ground spoilers and thrust reversers deployed and the autobrakes activated. Still the airplane did not decelerate as expected and the pilot applied manual braking. The airplane failed to stop and overran the runway end. It collided with ILS aerials, which caused a fire in engines no. 2 and no. 3.

The aircraft was withdrawn from use at Düsseldorf until being scrapped there in April 2006.

Causes:
The accident is attributable to the fact that the braking values transmitted to the crew did not meet the conditions that had arisen as a result of heavy snowfall since the last measurement on the runway.
Contributing factors:
- Fast changing weather
- The lack of an in all weather conditions reliable measurement method for the determination of braking coefficient.

Accident investigation:
cover
  
Investigating agency: BFU
Report number: BFU AX001-05
Status: Investigation completed
Duration: 8 years and 8 months
Download report: Final report

Sources:


Location

Images:


photo (c) Felix Goetting; Düsseldorf Airport (DUS); 24 January 2005


photo (c) Felix Goetting; Düsseldorf Airport (DUS); 24 January 2005


photo (c) Felix Goetting; Düsseldorf Airport (DUS); 24 January 2005


photo (c) via Werner Fischdick; Miami International Airport, FL (MIA); February 2000

Revision history:

Date/timeContributorUpdates

The Aviation Safety Network is an exclusive service provided by:
Quick Links:

CONNECT WITH US: FSF on social media FSF Facebook FSF Twitter FSF Youtube FSF LinkedIn FSF Instagram

©2024 Flight Safety Foundation

1920 Ballenger Av, 4th Fl.
Alexandria, Virginia 22314
www.FlightSafety.org